K.N.R Husbands Highway Bridge Reconstruction

K.N.R Husbands Highway Bridge Reconstruction

(BTI) The Barbados Tourism Investment Inc. (BTI) wishes to remind the public of the continuation of the Salt Pond Flood Mitigation Project. The project, now in its 2nd Phase will require the closure of the bridge on the KNR Highway in Speightstown. These changes are...
Closure Of BTII Construction Sites

Closure Of BTII Construction Sites

(Stock Photo) The Barbados Tourism Investment Inc. (BTII) advises the public that due to the National Pause from February 3 to 17, the following sites will be closed: Golden Square Freedom Park, Fairchild St, Bridgetown; the Salt Pond Project – Phase II, Speightstown,...

Pin It on Pinterest