The National Petroleum Corporation (NPC) has advised that road work will be conducted in National Heroes Square, Bridgetown, from 8:00 p.m. on Monday, November 13, to 2.00 a.m. on Tuesday, November 14.
As a result, there may be low to no gas pressure during that period in the areas of Upper and Lower Broad Street, St. Michael Row, Marhill Street, and surrounding areas.
The NPC urges members of the public to exercise caution while travelling in the National Heroes Square area and thanks them for their cooperation.